Table of Content
1 INTRODUCTION
1.1 OBJECTIVES OF THE STUDY
1.2 MARKET DEFINITION
1.3 OVERVIEW OF NORTH AMERICA DATA CENTER CONSTRUCTION MARKET
1.4 LIMITATIONS
1.5 MARKETS COVERED
2 MARKET SEGMENTATION
2.1 MARKETS COVERED
2.2 GEOGRAPHICAL SCOPE
2.3 YEARS CONSIDERED FOR THE STUDY
2.4 CURRENCY AND PRICING
2.5 DBMR TRIPOD DATA VALIDATION MODEL
2.6 MULTIVARIATE MODELLING
2.7 INFRASTRUCUTRE TYPE LIFELINE CURVE
2.8 PRIMARY INTERVIEWS WITH KEY OPINION LEADERS
2.9 DBMR MARKET POSITION GRID
2.1 VENDOR SHARE ANALYSIS
2.11 SECONDARY SOURCES
2.12 ASSUMPTIONS
3 EXECUTIVE SUMMARY
4 PREMIUM INSIGHTS
5 MARKET OVERVIEW
5.1 DRIVERS
5.1.1 RISING CONSTRUCTION OF HYPERSCALE DATACENTER FACILITIES
5.1.2 INCREASING DEMAND FOR DATA CENTER COLOCATION
5.1.3 GROWING DEMAND OF DATA CENTERS FROM BANKING AND FINANCE SECTOR
5.1.4 RISING DATA TRAFFIC DUE TO IOT AND CLOUD-BASED SERVICES
5.1.5 INTRODUCTION OF INTERCONNECTED DEVICES IN PUBLIC AND PRIVATE SPACES
5.2 RESTRAINTS
5.2.1 HIGH INITIAL INVESTMENT COSTS FOR DATA CENTER CONSTRUCTION
5.2.2 HIGH CARBON EMISSIONS FROM DATA CENTERS
5.3 OPPORTUNITIES
5.3.1 RAPIDLY INCREASING DIGITALIZATION ACROSS THE VERTICALS
5.3.2 INCREASING GENERATION OF UNSTRUCTURED DATA
5.3.3 RISE IN DEMAND FOR GREEN DATA CENTER
5.3.4 5G ROLLOUT TO INCREASE EDGE DATA CENTER INVESTMENTS
5.3.5 RISING GOVERNMENT INITIATIVES TOWARDS CONSTRUCTION OF DATA CENTER
5.4 CHALLENGES
5.4.1 LACK OF SKILLED PERSONNEL
5.4.2 LOCATION OF DATA CENTER CONSTRUCTION
6 COVID-19 IMPACT ON DATA CENTER CONSTRUCTION MARKET
6.1 AFTERMATH OF COVID-19
6.2 STRATEGIC DECISIONS FOR MANUFACTURERS AFTER COVID-19 TO GAIN COMPETITIVE MARKET SHARE
6.3 IMPACT ON DEMAND
6.4 IMPACT ON SUPPLY CHAIN
6.5 CONCLUSION
7 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE
7.1 OVERVIEW
7.2 ELECTRICAL INFRASTRUCTURE
7.2.1 UPS
7.2.2 GENERATORS
7.2.3 RACK POWER DISTRIBUTION UNIT
7.2.4 TRANSFER SWITCHES & SWITCHGEARS
7.2.5 OTHERS
7.3 MECHANICAL
7.3.1 COOLING SYSTEMS
7.3.2 RACKS
7.4 GENERAL INFRASTRUCTURE
7.4.1 BUILDING DEVELOPMENT
7.4.2 PHYSICAL SECURITY
7.4.3 DATA CENTER INFRASTRUCTURE MANAGEMENTSYSTEM
7.4.4 BUILDING DESIGN
7.4.5 INSTALLATION AND COMMISIONING SERVICES
8 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY DATA CENTRE TYPE
8.1 OVERVIEW
8.1.1 TIER III
8.1.2 TIER IV
8.1.3 TIER II
8.1.4 TIER I
9 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY ORGANISATION SIZE
9.1 OVERVIEW
9.1.1 LARGE ORGANISATION
9.1.2 SMALL ORGANISATION
9.1.3 MEDIUM ORGANISATION
10 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY VERTICALS
10.1 OVERVIEW
10.1.1 BANKING AND FINANCIAL SERVICES
10.1.2 IT TELECOMMUNICATION
10.1.3 RETAIL COLOCATION
10.1.4 GOVERNEMENT & DEFENSE
10.1.5 HEALTHCARE
10.1.6 MANUFACTURING
10.1.7 POWER & ENERGY
10.1.8 OTHERS
11 NORTH AMERICADATA CENTER CONSTRUCTION MARKET, BY GEOGRAPHY
11.1 NORTH AMERICA
11.1.1 U.S.
11.1.2 CANADA
11.1.3 MEXICO
12 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, COMPANY LANDSCAPE
12.1 COMPANY SHARE ANALYSIS: NORTH AMERICA
13 SWOT ANALYSIS
14 COMPANY PROFILE
14.1 TURNER CONSTRUCTION COMPANY. (A SUBSIDIARY OF HOCHTIEF AKTIENGESELLSCHAFT)
14.1.1 COMPANY SNAPSHOT
14.1.2 REVENUE ANALYSIS
14.1.3 PROJECT PORTFOLIO
14.1.4 RECENT DEVELOPMENTS
14.2 DPR CONSTRUCTION
14.2.1 COMPANY SNAPSHOT
14.2.2 PRODUCT PORTFOLIO
14.2.3 RECENT DEVELOPMENT
14.3 AECOM
14.3.1 COMPANY SNAPSHOT
14.3.2 REVENUE ANALYSIS
14.3.3 PROJECT PORTFOLIO
14.3.4 RECENT DEVELOPMENTS
14.4 FORTIS CONSTRUCTION
14.4.1 COMPANY SNAPSHOT
14.4.2 SERVICE PORTFOLIO
14.4.3 RECENT DEVELOPMENT
14.5 M. A. MORTENSON COMPANY
14.5.1 COMPANY SNAPSHOT
14.5.2 PROJECT PORTFOLIO
14.5.3 RECENT DEVELOPMENTS
14.6 ARUP
14.6.1 COMPANY SNAPSHOT
14.6.2 EXPERTISE PORTFOLIO
14.6.3 RECENT DEVELOPMENT
14.7 BRASFIELD & GORRIE, L.L.C.
14.7.1 COMPANY SNAPSHOT
14.7.2 EXPERTISE PORTFOLIO
14.7.3 RECENT DEVELOPMENTS
14.8 CORGAN
14.8.1 COMPANY SNAPSHOT
14.8.2 PRODUCT PORTFOLIO
14.8.3 RECENT DEVELOPMENT
14.9 CURRIE & BROWN HOLDINGS LIMITED
14.9.1 COMPANY SNAPSHOT
14.9.2 SERVICE PORTFOLIO
14.9.3 RECENT DEVELOPMENT
14.1 GENSLER
14.10.1 COMPANY SNAPSHOT
14.10.2 EXPERTISE PORTFOLIO
14.10.3 RECENT DEVELOPMENT
14.11 HDR
14.11.1 COMPANY SNAPSHOT
14.11.2 SERVICE PORTFOLIO
14.11.3 RECENT DEVELOPMENT
14.12 HOLDER CONSTRUCTION GROUP, LLC
14.12.1 COMPANY SNAPSHOT
14.12.2 PROJECT PORTFOLIO
14.12.3 RECENT DEVELOPMENT
14.13 JACOBS
14.13.1 COMPANY SNAPSHOT
14.13.2 REVENUE ANALYSIS
14.13.3 SERVICE PORTFOLIO
14.13.4 RECENT DEVELOPMENTS
14.14 ROGERS-O’BRIEN CONSTRUCTION COMPANY, LTD
14.14.1 COMPANY SNAPSHOT
14.14.2 SERVICE PORTFOLIO
14.14.3 RECENT DEVELOPMENT
14.15 SCHNEIDER ELECTRIC
14.15.1 COMPANY SNAPSHOT
14.15.2 REVENUE ANALYSIS
14.15.3 SERVICE PORTFOLIO
14.15.4 RECENT DEVELOPMENTS
14.16 SKANSKA
14.16.1 COMPANY SNAPSHOT
14.16.2 REVENUE ANALYSIS
14.16.3 SERVICE PORTFOLIO
14.16.4 RECENT DEVELOPMENT
14.17 STRUCTURE TONE ORGANIZATION
14.17.1 COMPANY SNAPSHOT
14.17.2 SERVICE PORTFOLIO
14.17.3 RECENT DEVELOPMENTS
14.18 THE BOLDT COMPANY
14.18.1 COMPANY SNAPSHOT
14.18.2 SERVICE PORTFOLIO
14.18.3 RECENT DEVELOPMENT
15 QUESTIONNAIRE
16 RELATED REPORTS
List of Table
LIST OF TABLES
TABLE 1 NORTH AMERICADATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2018-2027 (USD MILLION)
TABLE 2 NORTH AMERICA ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)
TABLE 3 NORTH AMERICA UPS IN ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)
TABLE 4 NORTH AMERICA GENRATORS IN ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)
TABLE 5 NORTH AMERICA RACK POWER IN ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)
TABLE 6 NORTH AMERICA TRANSFER SWITCHES & SWICTHGEAR IN ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)
TABLE 7 NORTH AMERICA OTHERS IN ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)
TABLE 8 NORTH AMERICA MECHANICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)
TABLE 9 NORTH AMERICA COOLING SYSTEM IN MECHANICAL CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)
TABLE 10 NORTH AMERICA RACKS IN MECHANICAL CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)
TABLE 11 NORTH AMERICA GENERAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)
TABLE 12 NORTH AMERICA BUILDING DEVELOPMENT IN GENERAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)
TABLE 13 NORTH AMERICA PHYSICAL SECURITY IN GENERAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)
TABLE 14 NORTH AMERICADATA CENTRE INFRASTRUCTURE MANAGEMENTSYSTEM IN GENERAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)
TABLE 15 NORTH AMERICA BUILDING DEVELOPMENT IN GENERAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)
TABLE 16 NORTH AMERICA INFRASTRUCTURE AND COMMISIONING SERVICES IN GENERAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)
TABLE 17 NORTH AMERICADATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2018-2027 (USD MILLION)
TABLE 18 NORTH AMERICA TIER III DATA CENTRE TYPE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)
TABLE 19 NORTH AMERICA TIER IV DATA CENTRE TYPE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)
TABLE 20 NORTH AMERICA TIER IV DATA CENTRE TYPE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)
TABLE 21 NORTH AMERICA TIER IV DATA CENTRE TYPE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)
TABLE 22 NORTH AMERICADATA CENTER CONSTRUCTION MARKET, BY ORGANISATION SIZE, 2018-2027 (USD MILLION)
TABLE 23 NORTH AMERICALARGE ORGANISATION DATA CENTRE TYPE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)
TABLE 24 NORTH AMERICASMALL ORGANISATION DATA CENTRE TYPE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)
TABLE 25 NORTH AMERICAMEDIUM ORGANISATION DATA CENTRE TYPE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)
TABLE 26 NORTH AMERICADATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2018-2027 (USD MILLION)
TABLE 27 NORTH AMERICABANKING AND FINANCIAL SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)
TABLE 28 NORTH AMERICAIT TELECOMMUNICATIONIN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)
TABLE 29 NORTH AMERICARETAIL IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)
TABLE 30 NORTH AMERICAGOVERNEMNT & DEFENSEIN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)
TABLE 31 NORTH AMERICAHELATHCARE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)
TABLE 32 NORTH AMERICAMANUFACTURING IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)
TABLE 33 NORTH AMERICAPOWER & ENERGY IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)
TABLE 34 NORTH AMERICAOTHERS IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)
TABLE 35 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY COUNTRY, 2018-2027 (USD MILLION)
TABLE 36 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2018-2027 (USD MILLION)
TABLE 37 NORTH AMERICA ELECTRICAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BYTYPE, 2018-2027 (USD MILLION)
TABLE 38 NORTH AMERICA MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)
TABLE 39 NORTH AMERICA COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)
TABLE 40 NORTH AMERICA GENERAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)
TABLE 41 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2018-2027 (USD MILLION)
TABLE 42 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2018-2027 (USD MILLION)
TABLE 43 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2018-2027 (USD MILLION)
TABLE 44 U.S. DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2018-2027 (USD MILLION)
TABLE 45 U.S. ELECTRICAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BYTYPE, 2018-2027 (USD MILLION)
TABLE 46 U.S. MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)
TABLE 47 U.S. COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)
TABLE 48 U.S. GENERAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)
TABLE 49 U.S. DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2018-2027 (USD MILLION)
TABLE 50 U.S. DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2018-2027 (USD MILLION)
TABLE 51 U.S. DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2018-2027 (USD MILLION)
TABLE 52 CANADA DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2018-2027 (USD MILLION)
TABLE 53 CANADA ELECTRICAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BYTYPE, 2018-2027 (USD MILLION)
TABLE 54 CANADA MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)
TABLE 55 CANADA COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)
TABLE 56 CANADA GENERAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)
TABLE 57 CANADA DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2018-2027 (USD MILLION)
TABLE 58 CANADA DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2018-2027 (USD MILLION)
TABLE 59 CANADA DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2018-2027 (USD MILLION)
TABLE 60 MEXICO DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2018-2027 (USD MILLION)
TABLE 61 MEXICO ELECTRICAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BYTYPE, 2018-2027 (USD MILLION)
TABLE 62 MEXICO MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)
TABLE 63 MEXICO COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)
TABLE 64 MEXICO GENERAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)
TABLE 65 MEXICO DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2018-2027 (USD MILLION)
TABLE 66 MEXICO DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2018-2027 (USD MILLION)
TABLE 67 MEXICO DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2018-2027 (USD MILLION)
List of Figure
LIST OF FIGURES
FIGURE 1 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: SEGMENTATION
FIGURE 2 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: DATA TRIANGULATION
FIGURE 3 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: DROC ANALYSIS
FIGURE 4 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: NORTH AMERICA VS GLOBAL MARKET ANALYSIS
FIGURE 5 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: COMPANY RESEARCH ANALYSIS
FIGURE 6 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: INTERVIEW DEMOGRAPHICS
FIGURE 7 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: DBMR MARKET POSITION GRID
FIGURE 8 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: VENDOR SHARE ANALYSIS
FIGURE 9 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: SEGMENTATION
FIGURE 10 RISING CONSTRUCTION OF HYPERSCALE DATA CENTER FACILITIES IS MAJOR FACTOR DRIVE THE NORTH AMERICA DATA CENTER CONSTRUCTION MARKET IN THE FORECAST PERIOD OF 2020TO 2027
FIGURE 11 ELECTRICAL INFRASTRUCTURE SEGMENT IS EXPECTED TO ACCOUNT FOR THE LARGEST SHARE OF THE NORTH AMERICA DATA CENTER CONSTRUCTION MARKET IN 2020 & 2027
FIGURE 12 DRIVERS, RESTRAINTS, OPPORTUNITIES AND CHALLENGES OF NORTH AMERICA DATA CENTER CONSTRUCTION MARKET
FIGURE 13 ENERGY CONSUMPTION OF DATA CENTER AND OFFICE BUILDINGS
FIGURE 14 ELECTRICITY GENERATION BY FUEL TYPE FOR U.S.
FIGURE 15 ENVIRONMENTAL IMPACT OF BUILDINGS
FIGURE 16 DATA CENTER POWER DRAWS
FIGURE 17 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: BY INFRASTRUCTURE TYPE, 2019
FIGURE 18 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: BY DATA CENTER YPE, 2019
FIGURE 19 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: BY ORGANISATION SIZE, 2019
FIGURE 20 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: BY VERTICALS, 2019
FIGURE 21 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: SNAPSHOT (2019)
FIGURE 22 NORTH AMERICA DATA CENTER CONSTRUCTIONMARKET: BY COUNTRY (2019)
FIGURE 23 NORTH AMERICA DATA CENTER CONSTRUCTIONMARKET: BY COUNTRY (2020 & 2027)
FIGURE 24 NORTH AMERICA DATA CENTER CONSTRUCTIONMARKET: BY COUNTRY (2019 & 2027)
FIGURE 25 NORTH AMERICA DATA CENTER CONSTRUCTIONMARKET: BY APPLICATION(2020-2027)
FIGURE 26 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: COMPANY SHARE 2019 (%)