North America Data Center Construction Market Analysis

Request for TOC Request for TOC Speak to Analyst Speak to Analyst Buy Now Buy Now Inquire Before Buying Inquire Before Free Sample Report Free Sample Report

North America Data Center Construction Market Analysis

  • Semiconductors and Electronics
  • Upcoming Report
  • Apr 2022
  • North America
  • 350 Pages
  • No of Tables: 220
  • No of Figures: 60

Table of Content

1 INTRODUCTION

1.1 OBJECTIVES OF THE STUDY

1.2 MARKET DEFINITION

1.3 OVERVIEW OF NORTH AMERICA DATA CENTER CONSTRUCTION MARKET

1.4 LIMITATIONS

1.5 MARKETS COVERED

2 MARKET SEGMENTATION

2.1 MARKETS COVERED

2.2 GEOGRAPHICAL SCOPE

2.3 YEARS CONSIDERED FOR THE STUDY

2.4 CURRENCY AND PRICING

2.5 DBMR TRIPOD DATA VALIDATION MODEL

2.6 MULTIVARIATE MODELLING

2.7 INFRASTRUCUTRE TYPE LIFELINE CURVE

2.8 PRIMARY INTERVIEWS WITH KEY OPINION LEADERS

2.9 DBMR MARKET POSITION GRID

2.1 VENDOR SHARE ANALYSIS

2.11 SECONDARY SOURCES

2.12 ASSUMPTIONS

3 EXECUTIVE SUMMARY

4 PREMIUM INSIGHTS

5 MARKET OVERVIEW

5.1 DRIVERS

5.1.1 RISING CONSTRUCTION OF HYPERSCALE DATACENTER FACILITIES

5.1.2 INCREASING DEMAND FOR DATA CENTER COLOCATION

5.1.3 GROWING DEMAND OF DATA CENTERS FROM BANKING AND FINANCE SECTOR

5.1.4 RISING DATA TRAFFIC DUE TO IOT AND CLOUD-BASED SERVICES

5.1.5 INTRODUCTION OF INTERCONNECTED DEVICES IN PUBLIC AND PRIVATE SPACES

5.2 RESTRAINTS

5.2.1 HIGH INITIAL INVESTMENT COSTS FOR DATA CENTER CONSTRUCTION

5.2.2 HIGH CARBON EMISSIONS FROM DATA CENTERS

5.3 OPPORTUNITIES

5.3.1 RAPIDLY INCREASING DIGITALIZATION ACROSS THE VERTICALS

5.3.2 INCREASING GENERATION OF UNSTRUCTURED DATA

5.3.3 RISE IN DEMAND FOR GREEN DATA CENTER

5.3.4 5G ROLLOUT TO INCREASE EDGE DATA CENTER INVESTMENTS

5.3.5 RISING GOVERNMENT INITIATIVES TOWARDS CONSTRUCTION OF DATA CENTER

5.4 CHALLENGES

5.4.1 LACK OF SKILLED PERSONNEL

5.4.2 LOCATION OF DATA CENTER CONSTRUCTION

6 COVID-19 IMPACT ON DATA CENTER CONSTRUCTION MARKET

6.1 AFTERMATH OF COVID-19

6.2 STRATEGIC DECISIONS FOR MANUFACTURERS AFTER COVID-19 TO GAIN COMPETITIVE MARKET SHARE

6.3 IMPACT ON DEMAND

6.4 IMPACT ON SUPPLY CHAIN

6.5 CONCLUSION

7 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE

7.1 OVERVIEW

7.2 ELECTRICAL INFRASTRUCTURE

7.2.1 UPS

7.2.2 GENERATORS

7.2.3 RACK POWER DISTRIBUTION UNIT

7.2.4 TRANSFER SWITCHES & SWITCHGEARS

7.2.5 OTHERS

7.3 MECHANICAL

7.3.1 COOLING SYSTEMS

7.3.2 RACKS

7.4 GENERAL INFRASTRUCTURE

7.4.1 BUILDING DEVELOPMENT

7.4.2 PHYSICAL SECURITY

7.4.3 DATA CENTER INFRASTRUCTURE MANAGEMENTSYSTEM

7.4.4 BUILDING DESIGN

7.4.5 INSTALLATION AND COMMISIONING SERVICES

8 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY DATA CENTRE TYPE

8.1 OVERVIEW

8.1.1 TIER III

8.1.2 TIER IV

8.1.3 TIER II

8.1.4 TIER I

9 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY ORGANISATION SIZE

9.1 OVERVIEW

9.1.1 LARGE ORGANISATION

9.1.2 SMALL ORGANISATION

9.1.3 MEDIUM ORGANISATION

10 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY VERTICALS

10.1 OVERVIEW

10.1.1 BANKING AND FINANCIAL SERVICES

10.1.2 IT TELECOMMUNICATION

10.1.3 RETAIL COLOCATION

10.1.4 GOVERNEMENT & DEFENSE

10.1.5 HEALTHCARE

10.1.6 MANUFACTURING

10.1.7 POWER & ENERGY

10.1.8 OTHERS

11 NORTH AMERICADATA CENTER CONSTRUCTION MARKET, BY GEOGRAPHY

11.1 NORTH AMERICA

11.1.1 U.S.

11.1.2 CANADA

11.1.3 MEXICO

12 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, COMPANY LANDSCAPE

12.1 COMPANY SHARE ANALYSIS: NORTH AMERICA

13 SWOT ANALYSIS

14 COMPANY PROFILE

14.1 TURNER CONSTRUCTION COMPANY. (A SUBSIDIARY OF HOCHTIEF AKTIENGESELLSCHAFT)

14.1.1 COMPANY SNAPSHOT

14.1.2 REVENUE ANALYSIS

14.1.3 PROJECT PORTFOLIO

14.1.4 RECENT DEVELOPMENTS

14.2 DPR CONSTRUCTION

14.2.1 COMPANY SNAPSHOT

14.2.2 PRODUCT PORTFOLIO

14.2.3 RECENT DEVELOPMENT

14.3 AECOM

14.3.1 COMPANY SNAPSHOT

14.3.2 REVENUE ANALYSIS

14.3.3 PROJECT PORTFOLIO

14.3.4 RECENT DEVELOPMENTS

14.4 FORTIS CONSTRUCTION

14.4.1 COMPANY SNAPSHOT

14.4.2 SERVICE PORTFOLIO

14.4.3 RECENT DEVELOPMENT

14.5 M. A. MORTENSON COMPANY

14.5.1 COMPANY SNAPSHOT

14.5.2 PROJECT PORTFOLIO

14.5.3 RECENT DEVELOPMENTS

14.6 ARUP

14.6.1 COMPANY SNAPSHOT

14.6.2 EXPERTISE PORTFOLIO

14.6.3 RECENT DEVELOPMENT

14.7 BRASFIELD & GORRIE, L.L.C.

14.7.1 COMPANY SNAPSHOT

14.7.2 EXPERTISE PORTFOLIO

14.7.3 RECENT DEVELOPMENTS

14.8 CORGAN

14.8.1 COMPANY SNAPSHOT

14.8.2 PRODUCT PORTFOLIO

14.8.3 RECENT DEVELOPMENT

14.9 CURRIE & BROWN HOLDINGS LIMITED

14.9.1 COMPANY SNAPSHOT

14.9.2 SERVICE PORTFOLIO

14.9.3 RECENT DEVELOPMENT

14.1 GENSLER

14.10.1 COMPANY SNAPSHOT

14.10.2 EXPERTISE PORTFOLIO

14.10.3 RECENT DEVELOPMENT

14.11 HDR

14.11.1 COMPANY SNAPSHOT

14.11.2 SERVICE PORTFOLIO

14.11.3 RECENT DEVELOPMENT

14.12 HOLDER CONSTRUCTION GROUP, LLC

14.12.1 COMPANY SNAPSHOT

14.12.2 PROJECT PORTFOLIO

14.12.3 RECENT DEVELOPMENT

14.13 JACOBS

14.13.1 COMPANY SNAPSHOT

14.13.2 REVENUE ANALYSIS

14.13.3 SERVICE PORTFOLIO

14.13.4 RECENT DEVELOPMENTS

14.14 ROGERS-O’BRIEN CONSTRUCTION COMPANY, LTD

14.14.1 COMPANY SNAPSHOT

14.14.2 SERVICE PORTFOLIO

14.14.3 RECENT DEVELOPMENT

14.15 SCHNEIDER ELECTRIC

14.15.1 COMPANY SNAPSHOT

14.15.2 REVENUE ANALYSIS

14.15.3 SERVICE PORTFOLIO

14.15.4 RECENT DEVELOPMENTS

14.16 SKANSKA

14.16.1 COMPANY SNAPSHOT

14.16.2 REVENUE ANALYSIS

14.16.3 SERVICE PORTFOLIO

14.16.4 RECENT DEVELOPMENT

14.17 STRUCTURE TONE ORGANIZATION

14.17.1 COMPANY SNAPSHOT

14.17.2 SERVICE PORTFOLIO

14.17.3 RECENT DEVELOPMENTS

14.18 THE BOLDT COMPANY

14.18.1 COMPANY SNAPSHOT

14.18.2 SERVICE PORTFOLIO

14.18.3 RECENT DEVELOPMENT

15 QUESTIONNAIRE

16 RELATED REPORTS

List of Table

 LIST OF TABLES

TABLE 1 NORTH AMERICADATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2018-2027 (USD MILLION)

TABLE 2 NORTH AMERICA ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 3 NORTH AMERICA UPS IN ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 4 NORTH AMERICA GENRATORS IN ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 5 NORTH AMERICA RACK POWER IN ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 6 NORTH AMERICA TRANSFER SWITCHES & SWICTHGEAR IN ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 7 NORTH AMERICA OTHERS IN ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 8 NORTH AMERICA MECHANICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 9 NORTH AMERICA COOLING SYSTEM IN MECHANICAL CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 10 NORTH AMERICA RACKS IN MECHANICAL CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 11 NORTH AMERICA GENERAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 12 NORTH AMERICA BUILDING DEVELOPMENT IN GENERAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 13 NORTH AMERICA PHYSICAL SECURITY IN GENERAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 14 NORTH AMERICADATA CENTRE INFRASTRUCTURE MANAGEMENTSYSTEM IN GENERAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 15 NORTH AMERICA BUILDING DEVELOPMENT IN GENERAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 16 NORTH AMERICA INFRASTRUCTURE AND COMMISIONING SERVICES IN GENERAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY REGION,2018-2027 (USD MILLION)

TABLE 17 NORTH AMERICADATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2018-2027 (USD MILLION)

TABLE 18 NORTH AMERICA TIER III DATA CENTRE TYPE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 19 NORTH AMERICA TIER IV DATA CENTRE TYPE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 20 NORTH AMERICA TIER IV DATA CENTRE TYPE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 21 NORTH AMERICA TIER IV DATA CENTRE TYPE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 22 NORTH AMERICADATA CENTER CONSTRUCTION MARKET, BY ORGANISATION SIZE, 2018-2027 (USD MILLION)

TABLE 23 NORTH AMERICALARGE ORGANISATION DATA CENTRE TYPE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 24 NORTH AMERICASMALL ORGANISATION DATA CENTRE TYPE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 25 NORTH AMERICAMEDIUM ORGANISATION DATA CENTRE TYPE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 26 NORTH AMERICADATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2018-2027 (USD MILLION)

TABLE 27 NORTH AMERICABANKING AND FINANCIAL SERVICES IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 28 NORTH AMERICAIT TELECOMMUNICATIONIN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 29 NORTH AMERICARETAIL IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 30 NORTH AMERICAGOVERNEMNT & DEFENSEIN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 31 NORTH AMERICAHELATHCARE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 32 NORTH AMERICAMANUFACTURING IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 33 NORTH AMERICAPOWER & ENERGY IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 34 NORTH AMERICAOTHERS IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2018-2027, (USD MILLION)

TABLE 35 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY COUNTRY, 2018-2027 (USD MILLION)

TABLE 36 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2018-2027 (USD MILLION)

TABLE 37 NORTH AMERICA ELECTRICAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BYTYPE, 2018-2027 (USD MILLION)

TABLE 38 NORTH AMERICA MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 39 NORTH AMERICA COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 40 NORTH AMERICA GENERAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 41 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2018-2027 (USD MILLION)

TABLE 42 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2018-2027 (USD MILLION)

TABLE 43 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2018-2027 (USD MILLION)

TABLE 44 U.S. DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2018-2027 (USD MILLION)

TABLE 45 U.S. ELECTRICAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BYTYPE, 2018-2027 (USD MILLION)

TABLE 46 U.S. MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 47 U.S. COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 48 U.S. GENERAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 49 U.S. DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2018-2027 (USD MILLION)

TABLE 50 U.S. DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2018-2027 (USD MILLION)

TABLE 51 U.S. DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2018-2027 (USD MILLION)

TABLE 52 CANADA DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2018-2027 (USD MILLION)

TABLE 53 CANADA ELECTRICAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BYTYPE, 2018-2027 (USD MILLION)

TABLE 54 CANADA MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 55 CANADA COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 56 CANADA GENERAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 57 CANADA DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2018-2027 (USD MILLION)

TABLE 58 CANADA DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2018-2027 (USD MILLION)

TABLE 59 CANADA DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2018-2027 (USD MILLION)

TABLE 60 MEXICO DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2018-2027 (USD MILLION)

TABLE 61 MEXICO ELECTRICAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BYTYPE, 2018-2027 (USD MILLION)

TABLE 62 MEXICO MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 63 MEXICO COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 64 MEXICO GENERAL INFRASTRUCTUREDATA CENTER CONSTRUCTION MARKET, BY TYPE , 2018-2027 (USD MILLION)

TABLE 65 MEXICO DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2018-2027 (USD MILLION)

TABLE 66 MEXICO DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2018-2027 (USD MILLION)

TABLE 67 MEXICO DATA CENTER CONSTRUCTION MARKET, BY VERTICALS, 2018-2027 (USD MILLION)

List of Figure

LIST OF FIGURES 

FIGURE 1 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: SEGMENTATION

FIGURE 2 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: DATA TRIANGULATION

FIGURE 3 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: DROC ANALYSIS

FIGURE 4 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: NORTH AMERICA VS GLOBAL MARKET ANALYSIS

FIGURE 5 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: COMPANY RESEARCH ANALYSIS

FIGURE 6 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: INTERVIEW DEMOGRAPHICS

FIGURE 7 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: DBMR MARKET POSITION GRID

FIGURE 8 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: VENDOR SHARE ANALYSIS

FIGURE 9 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: SEGMENTATION

FIGURE 10 RISING CONSTRUCTION OF HYPERSCALE DATA CENTER FACILITIES IS MAJOR FACTOR DRIVE THE NORTH AMERICA DATA CENTER CONSTRUCTION MARKET IN THE FORECAST PERIOD OF 2020TO 2027

FIGURE 11 ELECTRICAL INFRASTRUCTURE SEGMENT IS EXPECTED TO ACCOUNT FOR THE LARGEST SHARE OF THE NORTH AMERICA DATA CENTER CONSTRUCTION MARKET IN 2020 & 2027

FIGURE 12 DRIVERS, RESTRAINTS, OPPORTUNITIES AND CHALLENGES OF NORTH AMERICA DATA CENTER CONSTRUCTION MARKET

FIGURE 13 ENERGY CONSUMPTION OF DATA CENTER AND OFFICE BUILDINGS

FIGURE 14 ELECTRICITY GENERATION BY FUEL TYPE FOR U.S.

FIGURE 15 ENVIRONMENTAL IMPACT OF BUILDINGS

FIGURE 16 DATA CENTER POWER DRAWS

FIGURE 17 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: BY INFRASTRUCTURE TYPE, 2019

FIGURE 18 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: BY DATA CENTER YPE, 2019

FIGURE 19 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: BY ORGANISATION SIZE, 2019

FIGURE 20 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: BY VERTICALS, 2019

FIGURE 21 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: SNAPSHOT (2019)

FIGURE 22 NORTH AMERICA DATA CENTER CONSTRUCTIONMARKET: BY COUNTRY (2019)

FIGURE 23 NORTH AMERICA DATA CENTER CONSTRUCTIONMARKET: BY COUNTRY (2020 & 2027)

FIGURE 24 NORTH AMERICA DATA CENTER CONSTRUCTIONMARKET: BY COUNTRY (2019 & 2027)

FIGURE 25 NORTH AMERICA DATA CENTER CONSTRUCTIONMARKET: BY APPLICATION(2020-2027)

FIGURE 26 NORTH AMERICA DATA CENTER CONSTRUCTION MARKET: COMPANY SHARE 2019 (%)

Frequently Asked Questions

The North America Data Center Construction Market will be projected to grow at a CAGR of 18.30% during forecast by 2029.
The North America Data Center Construction Market will be projected at USD 37,660.91 million during forecast by 2029.
The major players operating in the North America Data Center Construction Market are Turner Construction Company (US), DPR Construction (US), AECOM (US), Schneider Electric (France), M. A. Mortenson Company (US), Arup (UK), Brasfield & Gorrie, L.L.C. (US), CORGAN (US), Currie & Brown Holdings Limited (UK), Fortis Construction (US), Gensler (US), Holder Construction Group, LLC (US), Jacobs (US), ROGERS-O’BRIEN CONSTRUCTION COMPANY, LTD (US), Skanska (Sweden), Structure Tone Organization (US), The Boldt Company (US), among others.
The major countries covered in the North America Data Center Construction Market are U.S., Canada and Mexico in North America.